Böker Magnum Long Lead EDC 01SC080 gentleman's knife
Böker Magnum Long Lead EDC 01SC080 gentleman's knife
This product has been ordered. The delivery time is an indication. Please take delays into account.
Add engraving?
Full description
The Böker Magnum Long Lead EDC 01SC080 is a fancy and slim gentleman's knife. The Long Lead EDC is enhanced with an 8Cr13MoV steel blade with a slipjoint lock. A slipjoint won't completely block the blade. As such you can legally carry it with you almost anywhere. 8Cr13MoV is a decent type of steel you can easily sharpen yourself. Great for daily use. You open the knife with two hands with the help of the nailnick.
Specifications
8 cm
78 g
Material handle
G10
Type of steel
8Cr13MoV
Also popular
Reviews
Wednesday 21 August 2024
Thursday 1 December 2022
Wednesday 21 September 2022
Specifications
Dimensions & weight
8 cm
2.7 mm
Closed length
10.4 cm
Total length
18.4 cm
78 g
Material
Material handle
G10
Type of steel
8Cr13MoV
57 HRC
Features & functions
Finish blade
satin
Right or left-handed
symmetrical
Blade shape
drop point
plain edge
No
Tools
knife
Opening system
nail nick
Type
everyday carry, gentleman’s knife
Pocket clip
yes, tip-down (right)
Pocket clip position
tip-down
Pocket clip side
right
slipjoint
Can be opened with one hand
No
flat, Secondary V-edge
Number of tools
1
Scope of delivery
Pouch
No
Sheath
No
Recommended combi-deals
Böker Magnum Long Lead EDC 01SC080 gentleman's knife
This product has been ordered. The delivery time is an indication. Please take delays into account.
Add engraving?